Trackpanel Laying & Removal System - Modular system to lay or remove trackpanels without deformation:
System configuration:
PEM XL gantries with connection bars,
LMC motorized caterpillar trolley,
LEM 460 motorized transportation trolley,
P2PV loading and transportation beam with connection ramp.
Radio controlled and synchronized by an operator per driving post (transfer, laying, transport).
Modular and adapted to different lengths of trackpanels:
36 m = 3 PEM XL gantries
24 m = 2 PEM XL gantries
Loading capacity: 22 t (option 24 t)
Weight: transfer: 17,4 t
laying: 16,5 t
transport: 23 t

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…