
Ecofab Build Diary: Bosvigo School
3 years ago
Video diary over 4 days during the build at Bosvigo School, Truro, Cornwall in April 2008.
-----------------------------------------------------------
Overview
Bosvigo Children's Centre was designed to provide a fast, sustainable building solution on a restricted site providing a Children's Centre and community facilities within a school campus.
The design provides approximately 100 sqm or floorspace including Creche, training area, kitchen, office and fully DDA compliant wc facilities. The building also contributes to landscape revisions providing a reception area for the main school entrance.
The building sits within a conservation area and as such, the 4KW photovoltaic array has been sited on an adjacent, existing building owing to overshadowing of protected trees to the south of building. The building boasts Breeam excellent rating and is two points short of carbon neutral. Space is heated with Air source heat pump with underfloor distribution. The building is naturally ventilated.
The building is finished with natural slate pitched roof, green flat roof sections and is clad with local western red cedar and lime render. The building eventually cost just under £160,000 not including fees and additional external works/landscaping to the schools entrance.
-----------------------------------------------------------
Overview
Bosvigo Children's Centre was designed to provide a fast, sustainable building solution on a restricted site providing a Children's Centre and community facilities within a school campus.
The design provides approximately 100 sqm or floorspace including Creche, training area, kitchen, office and fully DDA compliant wc facilities. The building also contributes to landscape revisions providing a reception area for the main school entrance.
The building sits within a conservation area and as such, the 4KW photovoltaic array has been sited on an adjacent, existing building owing to overshadowing of protected trees to the south of building. The building boasts Breeam excellent rating and is two points short of carbon neutral. Space is heated with Air source heat pump with underfloor distribution. The building is naturally ventilated.
The building is finished with natural slate pitched roof, green flat roof sections and is clad with local western red cedar and lime render. The building eventually cost just under £160,000 not including fees and additional external works/landscaping to the schools entrance.
FLV
00:10:31
2 Related collections
| Date | Plays | Likes | Comments |
|---|---|---|---|
| Totals | 766 | 1 | 0 |
| Feb 14th | 2 | 0 | 0 |
| Feb 13th | 4 | 0 | 0 |
| Feb 12th | 2 | 0 | 0 |
| Feb 11th | 0 | 0 | 0 |
| Feb 10th | 1 | 0 | 0 |
| Feb 9th | 0 | 0 | 0 |
| Feb 8th | 0 | 0 | 0 |
-
Vimeo: About / Blog / Developers / Jobs /
Community Guidelines /
Help Center / Video School / Music Store / Site Map
/ Vimeo
or
-
Legal: TM + ©2012 Vimeo, LLC. All rights reserved. / Terms of Service / Privacy Statement / Copyright




Prev week