00:00
43
More
See all Show me
35. Microsoft CES Video Wall and Keynote in 43 seconds
1 month ago
Video Wall in the Microsoft Pavilion

Two Windows 7 server systems running the latest version of WATCHOUT. The main system and backup run 63 - 47" lcd screens in a 7 channel configuration resulted in a 70 x 5'8" animated looping wall.

Microsoft Keynote

The 90 minute keynote utilized looping animated backgrounds, scenic background images, and a metro animation that we built to seamlessly tie the visuals together.

Deployment: Mind Opera
Creative: PBJS
Motion Production: Run Studios

Microsoft Time-Lapse booth construction and Keynote footage by Microsoft.

Credits

Likes

  • Mark Feijo 1 month ago
    Looks like it was a ton of work-- really turned out great.

    Congrats!!
  •  
  • MOOV 1 month ago
    respect!
  •  
This conversation is missing your voice. Take five seconds to join Vimeo or log in.

Advertisement

About this video

MPE
00:00:43
  • 1280x720, 72.58MB
  • Uploaded Thu January 12, 2012
  • Please join or log in to download
1 Related collection

Statistics

Date Plays Comments
Totals 2,168 2 2
Feb 24th 0 0 0
Feb 23rd 20 0 0
Feb 22nd 20 0 0
Feb 21st 34 0 0
Feb 20th 23 0 0
Feb 19th 15 0 0
Feb 18th 21 0 0