00:00
1119
This video shows how typical bridges can be replaced quickly and cost-effectively with accelerated techniques that do not require special equipment. More than the overview of the Keg Creek bridge replacement project shown in the companion video One Design--10,000 Bridges, ABC for Everyday Bridges highlights the specific techniques used to deliver a new bridge with only a 10-day closure. The design tool kit used in the project was developed through the second Strategic Highway Research Program, a division of the Transportation Research Board.