This video shows a time-lapse of the installation process for the 2011 BOFFO Building Fashion project: Ohne Titel & EASTON+COMBS.

The time lapse shows the build up of the structural wall / display system. The wall system was developed and engineered to be assembled without the use of hand tools and fastening hardware. The wall height reaches over 10' (2.5m) and can be assembled in less than a day.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…