In April 2012, as part of a major MOO HQ office refit, a new wall was installed in the main reception area. Over a period of two days, the wall was painted with the colour spectrum, with our Dan, Creative Director's iPhone 4S capturing one frame every minute.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…