Bristol led the way to remove the submarine theater from the old theme park at Aquarena Springs in San Marcos, TX. An 1,800 ton VersaCrane from Deep South Crane & Rigging was built on site over a two week period. Commercial divers from U.S. Underwater Services came in to secure the rigging below the surface. On May 22, 2012, the first of two submarine theaters, this one weighing about 500 tons, was successfully lifted out of Aquarena Springs.