The first two operations (out of four) on the Barely Rail DSLR baseplate that we manufacture. There are two more operations to be done on the part before it's tumbled, bead blasted, andodized, and assembled.

Cut on the UMC-10 fram FADEC Engineering.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…