In September of 2012 a crew of volunteer workers spend a week at the New Dungeness Light Station repainting the interior rooms of the Keeper's Quarters. First new insulation was sprayed into all the exterior walls; this resulted in about 500 holes that had to be patched before painting could begin. At the same time the roofs of the buildings were pressure washed and new anti-bird wires were installed. This video documents their work.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…