firecrackerworks.com

The construction process behind the build of the entrance tunnel at 100% Design exhibition Earls Court 2012 designed and built by Firecracker Works. We worked alongside Renegade & Studio Design UK throughout the process for Media 10.

Check us out at firecrackerworks.com

Kindly filmed and edited by Steve Hill

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…