I shot and directed this video which was captured over two nights in cold February up t'north of England.

On the first night at about 11:30pm the sky gave way to some heavy rain - it took a crew of 14 people almost 3 hours to get the set cleared and moved only 300 yards to transit. A nightmare load out by all accounts.
However all concerned are happy with the finished article.

The video was shot on a Z1 and graded using Color.

Check the band's stuff out at myspace.com/starlingsings
This conversation is missing your voice. Take five seconds to join Vimeo or log in.

Advertisement

Statistics

  •  
    plays
    likes
    comments
  • Total
    plays 56
    likes 0
    comments 0
  • Dec 27th
    plays 0
    likes 0
    comments 0
  • Dec 26th
    plays 0
    likes 0
    comments 0
  • Dec 25th
    plays 0
    likes 0
    comments 0
  • Dec 24th
    plays 0
    likes 0
    comments 0
  • Dec 23rd
    plays 1
    likes 0
    comments 0
  • Dec 22nd
    plays 0
    likes 0
    comments 0
  • Dec 21st
    plays 0
    likes 0
    comments 0
  • Dec 20th
    plays 1
    likes 0
    comments 0
Previous Week

Downloads

Please join Vimeo or log in to download the original file. It only takes a few seconds.