The CFA Scoresby Brigade replaced the original hose layer container with a Hytrans system that will hold over 2 kilometres of 100mm / 4" LDH (large diameter hose).
The hose laying was tested and successful at up to 40 km/hr.
The system also includes the Hytrans hose recovery unit (HRU) with actual recovery times during training of the LDH at a rate of 1 kilometre per 30 minutes.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…