A timelapse of the summer build project, designed and constructed by students of architecture on the Professional Diploma course at the Centre for Alternative Technology.

The entire construction process took just over 7 days, with a break mid-construction between modules. The building was designed to provide shelter for school children for outdoor classes and picnics, along with an evening bar area.

Thank you to all the members of staff who helped and offered their time.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…