On February 24th, 2010 the Telluride Ski Resort installed a bridge and staircase system over the span between Gold Hill Chute 8 & Chute 9 to provide better access to Palmyra Basin.

The stairs and bridge were designed and fabricated by 12 year veteran and Lift Master Mechanic, Mark Bosse.

Heliqwest, a helicopter company based out of Canada, airlifted the two steel staircases and bridge over the resort to to their final resting place on the left shoulder of Palmyra Peak.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…