Unloading one of two trucks containing 100 Swiftspace Solo stations, 3 Swiftspace Foresight stations and 200 Pedestals. This truck took 45 minutes to unload 65 Solo Stations and 3 Foresight and move them to the 22nd floor via freight elevator.
Read the whole story and see more photos at swiftspaceinc.com/swiftspace-installation-case-study/