UP 8224 pulled and stopped short of the Great Southwest (GSW) Pkwy crossing, in order to allow the conductor to get off the train, and flag the lead engine thru the crossing. The engineer was advised by Omaha DS to limit their speed to 25 mph adjacent to a maintenance crew that was repairing a switch on the #2 main, damaged by an earlier derailment.