Following the success of the 2015 Sheffield Business Awards, our challenge for 2016 was to go bigger and better. Incorporating 8 large format projection screens covering over 80ft, stunning 4K time lapse footage, DMX controlled tables centre pieces and fully integrated lighting design, this was certainly our biggest challenge to date.