"We are going to have to build a lot of long haul transmission, and as a country we have not made that decision"

The chief electricity regulator in Texas, the largest energy-producing state, on their renewable energy transmission plan. With Dr. Scott Tinker.

At the time of the interview, Barry Smitherman was Chairman of the Public Utility Commission of Texas.

The Switch Energy Project interviews leading experts on the energy topics that drive our world.

SwitchEnergyProject.com

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…