Florida Power & Light, a Florida utility company, demolished the boilers and smoke stacks of their Port Everglades Florida power facility, to make way for a new, more efficient and lower profile plant. This happened at 6:45 AM, on 16 July 2013.

This video time lapse video, shot with the Canon 5D MK2, was assembled in Sony Vegas Pro 12.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…