Presentation by Kleinschmidt Associates on results of a 7 month study regarding the flood event that took place in Eastern Charlotte County, New Brunswick between December 10 and December 13, 2010.

On December 17, 2010 Kleinschmidt Associates was hired to review the role of the dam at St. George in the flood event. The study focused on pre-storm conditions, the magnitude of the storm, and five key questions regarding the impact that operations at St. George Power LP would have had during the course of the event. Civil Engineer Ryan Berg, P.E. of Kleinschmidt Associates presented the results of the study at the Granite Town Inn in St. George, NB on July 28, 2011.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…