This file was used to measure the times that a series of markers spaced at .1 m intervals crossed a horizontal reference line. The mass density of the chain was .0194 kg/m.

The height of the middle of the pile above the ground was 1.53 m and the height of the loop above the pile was around .22 m when the steady state velocity of around 4.3 m/s.

Loading more stuff…

Hmm…it looks like things are taking a while to load. Try again?

Loading videos…