The work of component two (C2) of the Project consists of the construction of two (2) basins located adjacent to Canada Gobernadora on approximately thirty (30) acres in accordance with the final plans and specifications. The upper basin will be divided into a series of smaller basins and planted with wetland vegetation for treatment of urban runoff and low flows. The lower basin will be developed for storage of storm flows, which exceed the capacity of the upper basin to reduce the peak runoff from Coto de Caza. Additionally, the construction will consist of flow diversion facilities, basin inlet and outlet works, dewatering wells and low-flow pump stations and piping for re-use.