1. # vimeo.com/64727911 Uploaded 2 Plays 0 Comments
  2. # vimeo.com/64727883 Uploaded 1 Play 0 Comments
  3. # vimeo.com/64727881 Uploaded 1 Play 0 Comments
  4. # vimeo.com/64727879 Uploaded 1 Play 0 Comments
  5. # vimeo.com/64727877 Uploaded 1 Play 0 Comments

1:15.55 Scale AS-DS: Orifice at Adit Connection to Tunnel

John Cassidy Plus

Model runs of 500, 700, 900 and 1,100 mgd with orifice located at Adit connection to FST. 25, 50 and 75 percent tunnel fill levels. 8.5 ft-P Orifice

4/23/2013

Browse This Channel

Channels are a simple, beautiful way to showcase and watch videos. Browse more Channels.