1. Uploaded 0 Plays 0 Comments
  2. Uploaded 0 Plays 0 Comments
  3. Uploaded 0 Plays 0 Comments
  4. Uploaded 0 Plays 0 Comments
  5. Uploaded 0 Plays 0 Comments

13.24 Scale AS-DS: Orifice at Adit Connection to Tunnel

John Cassidy Plus

Model runs of 200, 500, and 725 mgd with orifice located at connection of adit to tunnel. 25 and 50 percent tunnel fill levels. 7.27 ft-P Orifice.

4/25/2013

Browse This Channel

Shout Box

Heads up: the shoutbox will be retiring soon. It’s tired of working, and can’t wait to relax. You can still send a message to the channel owner, though!

Channels are a simple, beautiful way to showcase and watch videos. Browse more Channels.