1. This 1994 shower failed due to poor design and materials. This reconstruction took about 100 hours to tear out and rebuild from the subfloor up. It uses The Tile Shop system of double layers of mortar sandwiched between a 40 mil liner and drain with a double system of weep holes. It also incorporates laytex into the mortar, thin set and grout to give it additional strength and flexibility to prevent future leaks.

    Music: Siesta by Jahzzar (betterwithmusic.com)

    # vimeo.com/87605716 Uploaded 56 Plays / / 0 Comments Watch in Couch Mode
  2. This video is about Hardwood Floors

    # vimeo.com/86393648 Uploaded 2 Plays / / 0 Comments Watch in Couch Mode
  3. This video is about Bathroom Makeover in Franklin, TN. A tear down of a 1950's bathroom to the studs and joists. They don't get any more complicated than this. 193 hours in all.

    # vimeo.com/86357347 Uploaded 5 Plays / / 0 Comments Watch in Couch Mode
  4. This video is about All Pro Home and Property Inspections and some strange construction problems.

    # vimeo.com/111044462 Uploaded 1 Play / / 0 Comments Watch in Couch Mode

Home Improvements

Athens-South Productions Plus

Browse This Channel

Shout Box

Channels are a simple, beautiful way to showcase and watch videos. Browse more Channels. Channels