1. Current condition show more sitework getting ready for placement and working to dry-in the main building. Roofing materials were stocked on the roof for the roofing to begin.

    # vimeo.com/132390523 Uploaded 16 Plays 0 Comments
  2. Working on roughing in the SOG and grading for additional parking lot.

    # vimeo.com/119186377 Uploaded 1 Play 0 Comments
  3. Forming additional tilt wall panels on the slab for the Nalco Champion project and continuing with the site earthwork for additional paving.

    # vimeo.com/120187242 Uploaded 4 Plays 0 Comments
  4. Progress onsite with the building pad, and dewatering of the site. The trailer has been relocated to the new paving in preparation for the construction of the pad to commence.

    # vimeo.com/114789447 Uploaded 43 Plays 0 Comments
  5. Close up of the auger cast pile process onsite.

    # vimeo.com/112121112 Uploaded 86 Plays 0 Comments

Nalco Champion

Tbone Plus

Browse This Channel

Shout Box

Heads up: the shoutbox will be retiring soon. It’s tired of working, and can’t wait to relax. You can still send a message to the channel owner, though!

Channels are a simple, beautiful way to showcase and watch videos. Browse more Channels.