1. For this project we had to set up the green screen studio and film our projects in there. The main aim was to successfully set up the studio with the correct lighting and camera settings so that it would enable us to pull a successful key. Because the green used on the curtain, platform and tights were all different shades, i had to do multiply keys. I also had some difficulties with the green reflecting on the shoes so had to do more masks and rotoscoping in order to pull a good key without losing any detail. Pretty much all of the white areas of the shoe had to be rotoscoped back in.

    # vimeo.com/76630821 Uploaded 1,029 Plays 0 Comments
  2. A side by side comparison behind making Joe Saturday Episode 1. See the original untouched footage next to the final film. Hear the finished film as it's always sounded before. Feel the hard work and sweat that went into one of the most scandalous productions of all time. Watching this may make you a better person, but we can't vouch for it.

    Visit http://www.joesaturday.com for more.

    # vimeo.com/1687418 Uploaded 1,109 Plays 7 Comments

DC

Denian Ouyang Plus

Browse This Channel

Shout Box

Heads up: the shoutbox will be retiring soon. It’s tired of working, and can’t wait to relax. You can still send a message to the channel owner, though!

Channels are a simple, beautiful way to showcase and watch videos. Browse more Channels.