1. The fences have gone up around the perimeter of the building as we prepare for construction to begin. Please hold the date for our Ground Breaking ceremony on October 11, 2013, at 10:30 a.m.

    # vimeo.com/73912655 Uploaded 523 Plays 0 Comments
  2. # vimeo.com/67031763 Uploaded 595 Plays 0 Comments
  3. The steel has been erected; the Commerce Building has been stripped bare except for concrete and steel and Phase 1 of construction is scheduled for completion Summer 2015.

    # vimeo.com/106616920 Uploaded 678 Plays 0 Comments

Media B-Roll - #GattonUnited

Gatton College Plus

B-Roll footage for Media

Browse This Channel

Shout Box

Heads up: the shoutbox will be retiring soon. It’s tired of working, and can’t wait to relax. You can still send a message to the channel owner, though!

Channels are a simple, beautiful way to showcase and watch videos. Browse more Channels.