or cancel
  1. Pumptrack @ Oak Mtn. State Park, AL

    05:49

    from Progressive Trail Design / Added

    1,160 Plays / / 0 Comments

    PTD was contracted by Shelby County to build a 16k square foot pumptrack in the beautiful Oak Mountain State Park in Pelham, AL. We worked side by side with one of the best volunteer groups ever,…

    + More details
    • Mountain Biking in Peru

      04:43

      from Progressive Trail Design / Added

      345 Plays / / 0 Comments

      In the fall of 2012 Jimmy Vonesh and I spent 3 weeks in Peru traveling and mountain biking. Most of our rides started at over 14,000 feet and descended over 6,000 feet. No XC rides here!

      + More details
      • PTD Bike Trip 2012

        03:48

        from Progressive Trail Design / Added

        324 Plays / / 0 Comments

        The PTD team got a little time off in June to do a bike trip through Colorado and New Mexico. Lots of amazing riding and good beer!

        + More details
        • Blue Ridge School Trail

          03:38

          from Progressive Trail Design / Added

          2,941 Plays / / 1 Comment

          2 mile multi-use trail wrapping around the perimeter of the Blue Ridge School. Built by Progressive Trail Design. St. George, VA

          + More details
          • Flow Trail in Meeker, CO

            03:18

            from Progressive Trail Design / Added

            8,635 Plays / / 0 Comments

            PTD was contracted by the ERBM Parks & Rec. district to build the first trail system in Meeker, CO. Along with 2.5 miles of multi-use trail we also built them a mountain bike specific downhill…

            + More details
            • Gravity Logic Freeride Trail. Snowmass, CO

              03:13

              from Progressive Trail Design / Added

              568 Plays / / 0 Comments

              Freeride Jump Trail in Snowmass, CO built by Gravity Logic and Progressive Trail Design.

              + More details
              • Anderson Gulch Trail. Meeker, CO

                02:37

                from Progressive Trail Design / Added

                789 Plays / / 0 Comments

                PTD was contracted by the ERBM Parks and Rec district to build 2.5 miles of flowy single track connecting to the trail at the top of China Wall. Starting at Phillip and Dorcas Jenson park you can…

                + More details

                Browse Videos

                Progressive Trail Design

                Here are all of the videos that Progressive Trail Design has uploaded to Vimeo. Appearances are videos that Progressive Trail Design has been credited in by others.

                Also Check Out