AlaskaDOTPF’s Videos
-
Proposed Farmers Loop Connection and Farmers Loop Extension Improvements
-
Module 3 - Grout Testing: Quality Verification, 14:31, 1,323MB
-
Module 2 - Inspection: Installation of Grout, 09:57, 909MB
-
Module 1 - Design: Behavior of Longitudinal Keyway, 04:01, 364MB
-
Alaska Safe Travels
-
Eagle River Bridge - Ribbon Cutting Ceremony
-
Rectangular Rapid-Flashing Beacon on Egan Drive - Juneau
-
University Avenue Chena River Bridge Closure pt. 3
-
University Avenue Chena River Bridge Closure, pt. 2
-
University Avenue Chena River Bridge Closure, pt. 1
-
Lazelle to Jo Pedestrians
-
Johansen EB to Steese NB
Browse Videos
VideosHere are all of the videos that AlaskaDOTPF has uploaded to Vimeo. Appearances are videos that AlaskaDOTPF has been credited in by others.